PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing the shear wall panels at Elev. 4-Stair -2 Facing South-West (800x600).jpg Installing the underground plumbing between column lines 3-3.5 from C-E. Facing West (800x600).jpg Layout for the underground plumbing at Men's Room 133 Facing North (800x600).jpg Raised the slip forms at stair -4 to the 4th and final floor Facing East (800x600).jpg Securing the shear wall panels at Elev. 4-Stair -2 (4th Floor) Facing South (800x600).jpg Stripped the shear wall panels at Stair -4 (3rd Floor) Facing North-East (800x600).jpg
Previous pageNext page Layout for the underground plumbing at Men's Room 133 Facing North (800x600)
Layout for the underground plumbing at Men's Room 133 Facing North (800x600)